CCPortal

浏览/检索结果: 共3条,第1-3条 帮助

已选(0)清除 条数/页:   排序方式:
Evaluation of green mine construction level in Tibet based on entropy method and TOPSIS 期刊论文
RESOURCES POLICY, 2024, 卷号: 88
作者:  Yin, Lijie;  Yi, Jianzhou;  Lin, Yibin;  Lin, Decai;  Wei, Baojun;  Zheng, Youye;  Peng, Hao
收藏  |  浏览/下载:22/0  |  提交时间:2024/03/01
Green mine construction  Tibet  Entropy weight TOPSIS method  Mine exploitation and utilization  Sustainable development of mining  
Assessment of provincial waterlogging risk based on entropy weight TOPSIS–PCA method 期刊论文
Natural Hazards, 2021, 卷号: 108, 期号: 2
作者:  Liu Z.;  Jiang Z.;  Xu C.;  Cai G.;  Zhan J.
收藏  |  浏览/下载:36/0  |  提交时间:2021/09/01
Coupled entropy weight TOPSIS–PCA model  Entropy weight TOPSIS method  Evaluation indicators  Principal component analysis  Waterlogging risk assessment  
Research on the urban resilience evaluation with hybrid multiple attribute TOPSIS method: an example in China 期刊论文
Natural Hazards, 2020, 卷号: 103, 期号: 1
作者:  Xun X.;  Yuan Y.
收藏  |  浏览/下载:53/0  |  提交时间:2021/09/01
Hybrid multiple attribute group decision-making  Intuitionistic trapezoidal fuzzy numbers  TOPSIS method  Urban resilience