CCPortal
DOI10.1016/j.resourpol.2023.104491
Evaluation of green mine construction level in Tibet based on entropy method and TOPSIS
Yin, Lijie; Yi, Jianzhou; Lin, Yibin; Lin, Decai; Wei, Baojun; Zheng, Youye; Peng, Hao
发表日期2024
ISSN0301-4207
EISSN1873-7641
卷号88
英文摘要Green mine construction is a systematic project involving the whole life cycle of mineral resources exploitation and utilization, representing the overall level of development potential. As an important strategic mineral resources reserve base in China, Tibet is rich in mineral resources. In order to calculate the level of green mine construction in Tibet, we obtained different data sources such as statistical yearbooks and mine construction information through field research and discussion. We establish the EMUCIMH evaluation system, select a total of 20 indexes from seven aspects(ecological mining environment, scientific mining method, efficient resource utilization, standardization of energy conservation and emission reduction, intelligent mine construction, standardization of enterprise management and harmonization of mining community),using the Entropy Weight TOPSIS Method to study the problems existing in the process of green mine construction, expecting to provide some references for government departments to make management decisions and for mining enterprises to improve green mine construction. The results show that among the 11 national green mines in Tibet, the construction status is uneven, and there are large differences in the mining methods, the comprehensive utilization of resources, and the ecological environment of mining areas. In contrast, The difference of standardization of enterprise management, intelligent mine construction and the harmonization of mining community is small. Among the specific indicators, in terms of exhaust emissions, mining community harmony and corporate culture are doing well, while they are relatively poor in terms of environmental management and monitoring, technological innovation, and intelligent mine, which need to be improved. Large and medium-sized mines, especially metal mines, the overall level of green mine construction is high, followed by small and medium-sized metal mines and individual Non-metal large mines, and mines with more historical problems faced more difficulties and challenges.
关键词Green mine constructionTibetEntropy weight TOPSIS methodMine exploitation and utilizationSustainable development of mining
英文关键词INTELLIGENT
WOS研究方向Environmental Studies
WOS记录号WOS:001136245000001
来源期刊RESOURCES POLICY
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/282559
作者单位China University of Geosciences - Beijing; China University of Geosciences - Beijing
推荐引用方式
GB/T 7714
Yin, Lijie,Yi, Jianzhou,Lin, Yibin,et al. Evaluation of green mine construction level in Tibet based on entropy method and TOPSIS[J],2024,88.
APA Yin, Lijie.,Yi, Jianzhou.,Lin, Yibin.,Lin, Decai.,Wei, Baojun.,...&Peng, Hao.(2024).Evaluation of green mine construction level in Tibet based on entropy method and TOPSIS.RESOURCES POLICY,88.
MLA Yin, Lijie,et al."Evaluation of green mine construction level in Tibet based on entropy method and TOPSIS".RESOURCES POLICY 88(2024).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Yin, Lijie]的文章
[Yi, Jianzhou]的文章
[Lin, Yibin]的文章
百度学术
百度学术中相似的文章
[Yin, Lijie]的文章
[Yi, Jianzhou]的文章
[Lin, Yibin]的文章
必应学术
必应学术中相似的文章
[Yin, Lijie]的文章
[Yi, Jianzhou]的文章
[Lin, Yibin]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。