Climate Change Data Portal
ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION | |
Lee, Ju-hyun1; Kim, Kyong Ju2; Kim, Seok3 | |
发表日期 | 2019 |
ISSN | 1582-9596 |
EISSN | 1843-3707 |
卷号 | 18期号:6页码:1177-1191 |
英文摘要 | Energy and resource consumption in construction projects is one of major causes to global warming. In order to evaluate the environmental load of construction projects, previous approaches calculated the quantities of construction materials and energy consumption from the use of equipment based on detailed design information after the completion of design. As a result, it is difficult to estimate environmental loads prior to design completion. This study is to develop an estimating model which can assess environmental loads for tunnel construction based on information available at the planning stage utilizing a case based reasoning approach. To validate the developed model, 10 verification cases were evaluated. The result showed that the mean absolute error rate (MAER) and the standard deviation (SD) of the proposed model were 8.9% and 6.0%, respectively, while the basic unit method were 21.4% and 12.9%, respectively. These results demonstrate that the proposed model is more accurate and more reliable than the basic unit method. The proposed model is expected to be a useful tool in reviewing environmental impacts of design alternatives and ensuring an environment-friendly design at the early stage of the project. |
WOS研究方向 | Environmental Sciences & Ecology |
来源期刊 | ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL
![]() |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/98273 |
作者单位 | 1.Chung Ang Univ, Dept Civil Engn, 84 Heukseok Ro, Seoul 06974, South Korea; 2.Chung Ang Univ, Sch Civil & Environm Engn Urban Design & Study, 84 Heukseok Ro, Seoul 06974, South Korea; 3.Korea Natl Univ Transportat, Dept Railroad Infrastruct Syst Engn, 157 Cheoldobangmulgwan Ro, Uiwang Si 16106, Gyeonggi Do, South Korea |
推荐引用方式 GB/T 7714 | Lee, Ju-hyun,Kim, Kyong Ju,Kim, Seok. ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION[J],2019,18(6):1177-1191. |
APA | Lee, Ju-hyun,Kim, Kyong Ju,&Kim, Seok.(2019).ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION.ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL,18(6),1177-1191. |
MLA | Lee, Ju-hyun,et al."ENVIRONMENTAL LOAD ESTIMATING MODEL FOR NATM TUNNEL USING CASE BASED REASONING IN THE PLANNING STAGE OF TUNNEL CONSTRUCTION".ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL 18.6(2019):1177-1191. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。