Climate Change Data Portal
Model metadata report for HS2 area 1 (Great Missenden to Aylesbury) | |
出版日期 | 2017 |
出版者 | British Geological Survey |
英文摘要 | This report describes the 3D geological model of HS2 (High Speed 2 rail link) Area 1 (Great Missenden to Aylesbury), created by Dr Andrew Farrant with support from Steve Thorpe and Ricky Terrington. The model was created as part of a set of nine geological models that cover the proposed HS2 rail route from the end of the HS2 London model to Birmingham and the West Coast Main Line near Lichfield. The models were funded from the NERC/BGS Science Budget to promote BGS modelling and geological interpretation services to this important infrastructure project and to test methodologies and procedures for creating geological models by multiple compilers. The report describes the model construction and purpose, with spatial limits and scale, sources of information, data processing, workflow, decisions, assumptions, rules and limitations, together with images of the model. |
URL | http://nora.nerc.ac.uk/id/eprint/519288/1/OR14075.pdf |
国家 | 英国 |
语种 | 英语 |
来源机构 | 英国自然环境研究理事会 |
文献类型 | 科技报告 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/86593 |
推荐引用方式 GB/T 7714 | . Model metadata report for HS2 area 1 (Great Missenden to Aylesbury):British Geological Survey,2017. |
条目包含的文件 | 下载所有文件 | |||||
文件名称/大小 | 资源类型 | 版本类型 | 开放类型 | 使用许可 | ||
519288.pdf(5988KB) | 科技报告 | 开放获取 | CC BY-NC-SA | 浏览 下载 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
百度学术 |
百度学术中相似的文章 |
必应学术 |
必应学术中相似的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。