Present in situ stress measurement in the eastern segment of Yarlung Zangbo River fault and fault activity analysis
Sun Wei-feng; Huang Huo-lin; Sun Dong-sheng; Meng Wen; Chen Qun-ce
发表日期2024
ISSN1000-7598
起始页码45
结束页码4
卷号45期号:4
英文摘要In order to determine the in situ stress state of the newly built hydropower station project in Jiacha county, and understand the activity of the eastern segment of the Yarlung Zangbo River fault zone, we obtained the in situ stress data in the engineering field by using the self-developed deep-hole stress measuring equipment based on the hydraulic fracturing method. We analyzed the fault activity by employing the Mohr-Coulomb failure criterion and the collected in situ stress data along the eastern segment of the Yarlung Zangbo River fault zone. The results showed that: (1) The magnitudes of the maximum horizontal stress SH ranged from 6.07 MPa to 37.62 MPa, the values of the minimum horizontal stress Sh were from 3.13 MPa to 20.33 MPa at the depth from 122.75 m to 418.75 m, and the dominant direction of the measured maximum horizontal principal stress was nearly NNE. (2) The stress regime was mainly characterized by SH> Sh> Sv (Sv is the vertical principal stress), which was prone to reverse faulting. (3) Most of the measured and collected Mohr stress circles intersected the failure threshold line with friction coefficient equal to 0.6, which indicated that the eastern segment of the Yarlung Zangbo River fault zone was in a high level of fault slip instability. Furthermore, the fault slip risk of the west section from Gongga to Langxian was higher than that of the east section near Linzhi along the eastern segment of the Yarlung Zangbo River fault zone.
英文关键词in situ stress; hydraulic fracturing method; fault activity; Yarlung Zangbo River fault; Qinghai-Tibet plateau
语种英语
WOS研究方向Engineering
WOS类目Engineering, Geological
WOS记录号WOS:001223065500017
来源期刊ROCK AND SOIL MECHANICS
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/288933
作者单位China Geological Survey; Chinese Academy of Geological Sciences; Institute of Geomechanics, Chinese Academy of Geological Sciences; Ministry of Natural Resources of the People's Republic of China; POWERCHINA Huadong Engineering Corporation Limited
推荐引用方式
GB/T 7714
Sun Wei-feng,Huang Huo-lin,Sun Dong-sheng,et al. Present in situ stress measurement in the eastern segment of Yarlung Zangbo River fault and fault activity analysis[J],2024,45(4).
APA Sun Wei-feng,Huang Huo-lin,Sun Dong-sheng,Meng Wen,&Chen Qun-ce.(2024).Present in situ stress measurement in the eastern segment of Yarlung Zangbo River fault and fault activity analysis.ROCK AND SOIL MECHANICS,45(4).
MLA Sun Wei-feng,et al."Present in situ stress measurement in the eastern segment of Yarlung Zangbo River fault and fault activity analysis".ROCK AND SOIL MECHANICS 45.4(2024).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Sun Wei-feng]的文章
[Huang Huo-lin]的文章
[Sun Dong-sheng]的文章
百度学术
百度学术中相似的文章
[Sun Wei-feng]的文章
[Huang Huo-lin]的文章
[Sun Dong-sheng]的文章
必应学术
必应学术中相似的文章
[Sun Wei-feng]的文章
[Huang Huo-lin]的文章
[Sun Dong-sheng]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。