The cost of uncoupling GB interconnectors
Guo B.; Newbery D.
发表日期2021
ISSN0301-4215
卷号158
英文摘要The UK left the EU Integrated Electricity Market on 31/12/20 and with it access to Single Day Ahead Coupling that clears local and cross-border trades jointly – interconnectors are implicitly auctioned. The new Trade and Cooperation Agreement requires a replacement “Multi-region loose volume coupling” to be introduced before April 2022. Until then, interconnector capacity is allocated by an explicit day-ahead auction before the EU auction with nomination after the EU results are known. The article measures the risks posed by taking positions in each market separately and the resulting costs of uncoupling of GB's interconnector trade. It compares four forecasts of price differences under two sequencing of markets and explicit auction, determining traders' risk discounts for each. The current timing leads to lower mistakes on the direction of flows, arguing for retaining current timing. Competitive traders locking in their positions after the explicit auction (overstating costs as subsequent trading out of unprofitable positions is ignored) limit the total loss of interconnector revenue from uncoupling to €31 million/yr. The social cost of uncoupling is €28 million/yr, considerably below earlier estimates in the literature. Experience since uncoupling validates this finding. © 2021 Elsevier Ltd
英文关键词Auctions; Electricity trading; Market coupling; Price forecasting
语种英语
scopus关键词Cost benefit analysis; Costs; Electric industry; Risk assessment; 'current; Cross-border trades; Day-ahead; Electricity trading; Explicit auctions; Interconnectors; Market coupling; Price forecasting; Trade agreements; Uncouplings; Power markets; auction; energy market; European Union; forecasting method; price determination; United Kingdom
来源期刊Energy Policy
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/256528
作者单位School of Applied Economics, Renmin University of China, China; Energy Policy Research Group, University of CambridgeUK, United Kingdom; Faculty of Economics, University of Cambridge, Sidgwick Ave., Cambridge, UK CB3 9DE, United Kingdom
推荐引用方式
GB/T 7714
Guo B.,Newbery D.. The cost of uncoupling GB interconnectors[J],2021,158.
APA Guo B.,&Newbery D..(2021).The cost of uncoupling GB interconnectors.Energy Policy,158.
MLA Guo B.,et al."The cost of uncoupling GB interconnectors".Energy Policy 158(2021).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Guo B.]的文章
[Newbery D.]的文章
百度学术
百度学术中相似的文章
[Guo B.]的文章
[Newbery D.]的文章
必应学术
必应学术中相似的文章
[Guo B.]的文章
[Newbery D.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。