DOI | 10.1016/j.enpol.2021.112734 |
Effects of local permitting and interconnection requirements on solar PV installation durations | |
O'Shaughnessy E.; Dong S.; Cook J.J.; Cruce J.; Ardani K.; Fekete E.; Margolis R. | |
发表日期 | 2022 |
ISSN | 0301-4215 |
卷号 | 161 |
英文摘要 | Most rooftop solar photovoltaic (PV) systems must be reviewed and approved by local governments and electric service providers prior to operation. These permitting, inspection, and interconnection (PII) requirements help ensure safe PV system installation and operation, but onerous requirements may needlessly delay construction and operation. Here, we analyze PV PII data to understand the effects of local PII requirements on PV process durations. We combine data on local PII requirements with estimates of process durations for 248,741 PV systems installed in the United States. The data show that local variations in PII requirements can partly explain variations in PV process durations. Requirements that would be expected to reduce durations—such as instant online approvals—are generally associated with shorter durations, while requirements that would be expected to increase durations—such as structural reviews—are associated with longer durations. We find only weak evidence that measures to expedite pre-install processes result in post-install delays, and similarly find only weak evidence that increased pre-install PII oversight can save time in post-install stages. Our results provide further rationale for PII authorities to analyze their requirements and identify opportunities to streamline PII processes. © 2021 Elsevier Ltd |
英文关键词 | Inspection; Interconnection; Permitting; Solar; Streamlining |
语种 | 英语 |
scopus关键词 | Renewable energy resources; Electric services; Interconnection; Interconnection requirements; Local government services; Permitting; Photovoltaic process; Photovoltaic systems; Solar; Solar photovoltaic system; Streamlining; Solar power generation; energy policy; local government; photovoltaic system; power generation; solar power; United States |
来源期刊 | Energy Policy |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/256398 |
作者单位 | Clean Kilowatts, LLC, United States; National Renewable Energy Laboratory, United States |
推荐引用方式 GB/T 7714 | O'Shaughnessy E.,Dong S.,Cook J.J.,et al. Effects of local permitting and interconnection requirements on solar PV installation durations[J],2022,161. |
APA | O'Shaughnessy E..,Dong S..,Cook J.J..,Cruce J..,Ardani K..,...&Margolis R..(2022).Effects of local permitting and interconnection requirements on solar PV installation durations.Energy Policy,161. |
MLA | O'Shaughnessy E.,et al."Effects of local permitting and interconnection requirements on solar PV installation durations".Energy Policy 161(2022). |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。