DOI10.1016/j.enpol.2021.112734
Effects of local permitting and interconnection requirements on solar PV installation durations
O'Shaughnessy E.; Dong S.; Cook J.J.; Cruce J.; Ardani K.; Fekete E.; Margolis R.
发表日期2022
ISSN0301-4215
卷号161
英文摘要Most rooftop solar photovoltaic (PV) systems must be reviewed and approved by local governments and electric service providers prior to operation. These permitting, inspection, and interconnection (PII) requirements help ensure safe PV system installation and operation, but onerous requirements may needlessly delay construction and operation. Here, we analyze PV PII data to understand the effects of local PII requirements on PV process durations. We combine data on local PII requirements with estimates of process durations for 248,741 PV systems installed in the United States. The data show that local variations in PII requirements can partly explain variations in PV process durations. Requirements that would be expected to reduce durations—such as instant online approvals—are generally associated with shorter durations, while requirements that would be expected to increase durations—such as structural reviews—are associated with longer durations. We find only weak evidence that measures to expedite pre-install processes result in post-install delays, and similarly find only weak evidence that increased pre-install PII oversight can save time in post-install stages. Our results provide further rationale for PII authorities to analyze their requirements and identify opportunities to streamline PII processes. © 2021 Elsevier Ltd
英文关键词Inspection; Interconnection; Permitting; Solar; Streamlining
语种英语
scopus关键词Renewable energy resources; Electric services; Interconnection; Interconnection requirements; Local government services; Permitting; Photovoltaic process; Photovoltaic systems; Solar; Solar photovoltaic system; Streamlining; Solar power generation; energy policy; local government; photovoltaic system; power generation; solar power; United States
来源期刊Energy Policy
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/256398
作者单位Clean Kilowatts, LLC, United States; National Renewable Energy Laboratory, United States
推荐引用方式
GB/T 7714
O'Shaughnessy E.,Dong S.,Cook J.J.,et al. Effects of local permitting and interconnection requirements on solar PV installation durations[J],2022,161.
APA O'Shaughnessy E..,Dong S..,Cook J.J..,Cruce J..,Ardani K..,...&Margolis R..(2022).Effects of local permitting and interconnection requirements on solar PV installation durations.Energy Policy,161.
MLA O'Shaughnessy E.,et al."Effects of local permitting and interconnection requirements on solar PV installation durations".Energy Policy 161(2022).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[O'Shaughnessy E.]的文章
[Dong S.]的文章
[Cook J.J.]的文章
百度学术
百度学术中相似的文章
[O'Shaughnessy E.]的文章
[Dong S.]的文章
[Cook J.J.]的文章
必应学术
必应学术中相似的文章
[O'Shaughnessy E.]的文章
[Dong S.]的文章
[Cook J.J.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。