Forecast and risk analysis of floodplain regarding uncertainty factors
Jokar E.; Arman A.; Azari A.
发表日期2021
ISSN0921030X
起始页码1125
结束页码1148
卷号107期号:2
英文摘要Today, it seems necessary to study and analyze the uncertainty in any plan, so that without considering and analyzing the uncertainty, the occurrence of undesired situations whose occurrence challenges the objectives of a plan is unexpected. The uncertainty is an integral part of hydrological and hydraulic models, and a proper evaluation of uncertainties in hydrological and hydraulic models may help avoid risky decisions, and high costs in product life cycle and design of structures. The purpose of this study is to predict and analyze the flood risk zone in different probabilities and investigate the role of uncertainty related to inlet flow hydrograph and Manning’s roughness coefficient in river flood zone in Seymareh river. The first step was flood zoning using the Hydrologic Engineering Center-River Analysis System model (Hec-Ras). Then, using synthetic data generation, 3049-year-old series of synthetic peak discharges were generated for 2-, 5-, 10-, 25-, 50- and 100-year return periods. Finally, using the discharge-probability curve, the probable boundaries of the river flood plain were determined at 90 and 10% probability levels, respectively. The results showed that the higher the degree of uncertainty of inflow discharges, the greater the rate of changes in flood and flood zone. In the next step, parameter space sampling (roughness coefficient of flood zone and channel) was performed using Monte Carlo simulation and the model was run 500 times. The simulated flood zone was evaluated based on observational flood zone using the F factor. The response-level curve obtained from Monte Carlo sampling showed that the highest F performance was when the channel roughness coefficient was 0.046 and the flood plain roughness coefficient was 0.058. Then, the uncertainty was determined using the cumulative distribution function of flood zones of the upper and lower limits. The results showed that taking into account the uncertainty threshold of the discharge in all return periods based on probabilities of 18 to 38% is able to cover all risks arising from inaccurate estimation of the flow rate in each return period. © 2021, The Author(s), under exclusive licence to Springer Nature B.V. part of Springer Nature.
关键词Probabilistic flood zoneSeymareh riverThe Monte CarloUncertainty
英文关键词flood forecasting; floodplain; hazard management; Monte Carlo analysis; peak discharge; risk assessment; uncertainty analysis; Iran; Seymareh River
语种英语
来源期刊Natural Hazards
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/206309
作者单位Department of Water Engineering, Razi University, Kermanshah, Iran
推荐引用方式
GB/T 7714
Jokar E.,Arman A.,Azari A.. Forecast and risk analysis of floodplain regarding uncertainty factors[J],2021,107(2).
APA Jokar E.,Arman A.,&Azari A..(2021).Forecast and risk analysis of floodplain regarding uncertainty factors.Natural Hazards,107(2).
MLA Jokar E.,et al."Forecast and risk analysis of floodplain regarding uncertainty factors".Natural Hazards 107.2(2021).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Jokar E.]的文章
[Arman A.]的文章
[Azari A.]的文章
百度学术
百度学术中相似的文章
[Jokar E.]的文章
[Arman A.]的文章
[Azari A.]的文章
必应学术
必应学术中相似的文章
[Jokar E.]的文章
[Arman A.]的文章
[Azari A.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。