CCPortal
DOI10.1016/j.foreco.2019.117800
Analysis of factors associated with the amount of forest road reconstruction activity in Turkey: Autoregressive distributed lag modelling approach
Akay A.O.; Akgul M.; Demir M.; Acar H.H.
发表日期2020
ISSN0378-1127
卷号458
英文摘要Forest roads are one of the most essential structures for the continuity of timber harvesting operations. To ensure continuity, forest roads must be open and stable during all seasons. The purpose of this study is to determine the relationships between the amount of forest road reconstruction (FRR) and the factors associated with it. These include average precipitation (AP) amount, timber harvesting (ındustrial wood) (TH) amount and forest road repair and maintenance (FRREM) amount. Also, study aims to test appropriate statistic models for forest road planning and management. In this study, an autoregressive distributed lag (ARDL) model, which is a time series analysis method, is used. Results from the ARDL model demonstrate that an increase in the amount of TH and AP in the long-run relationship negatively affected FRR amounts. In the short-run relationship, the TH and AP variables negatively affected the FRR variable, whereas the FRREM variable positively affected the FRR variable. Granger causality test results show that in the short run there was a one-way causality from FRREM to FRR. Also, for the Granger causality test in the long run, there was causality from other variables to FRREM. This demonstrates that timber harvesting amounts and changes in precipitation amounts due to climate change should be considered when determining road reconstruction activities. In addition, this work will enable forest road managers to make effective and accurate FRR budget planning decisions. © 2019 Elsevier B.V.
英文关键词Forest road; Road maintenance; Timber harvesting; Time series analysis
语种英语
scopus关键词Budget control; Climate change; Harmonic analysis; Harvesting; Logging (forestry); Repair; Roads and streets; Statistical tests; Timber; Time series analysis; Budget-planning; Forest roads; Granger causality test; Repair and maintenance; Road maintenance; Road reconstruction; Timber harvesting; Timber harvesting operations; Highway planning; Granger causality test; maintenance; reconstruction; repair; road construction; timber harvesting; time series analysis; Cost Control; Harvesting; Maintenance; Roads; Statistical Analysis; Time Series Analysis; Turkey
来源期刊Forest Ecology and Management
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/155563
作者单位Faculty of Forestry, Department of Forest Construction and Transportation, Istanbul University-Cerrahpasa, Bahcekoy, Sariyer, Istanbul, 34473, Turkey; Faculty of Health Sciences, Department of Occupational Health and Safety, Istanbul Yeni Yuzyıl University, Zeytinburnu, Istanbul, 34010, Turkey
推荐引用方式
GB/T 7714
Akay A.O.,Akgul M.,Demir M.,et al. Analysis of factors associated with the amount of forest road reconstruction activity in Turkey: Autoregressive distributed lag modelling approach[J],2020,458.
APA Akay A.O.,Akgul M.,Demir M.,&Acar H.H..(2020).Analysis of factors associated with the amount of forest road reconstruction activity in Turkey: Autoregressive distributed lag modelling approach.Forest Ecology and Management,458.
MLA Akay A.O.,et al."Analysis of factors associated with the amount of forest road reconstruction activity in Turkey: Autoregressive distributed lag modelling approach".Forest Ecology and Management 458(2020).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Akay A.O.]的文章
[Akgul M.]的文章
[Demir M.]的文章
百度学术
百度学术中相似的文章
[Akay A.O.]的文章
[Akgul M.]的文章
[Demir M.]的文章
必应学术
必应学术中相似的文章
[Akay A.O.]的文章
[Akgul M.]的文章
[Demir M.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。