CCPortal

浏览/检索结果: 共1条,第1-1条 帮助

已选(0)清除 条数/页:   排序方式:
Retraction Note to: Adapting project management method and ANFIS strategy for variables selection and analyzing wind turbine wake effect (Natural Hazards, (2014), 74, 2, (463-475), 10.1007/s11069-014-1189-1) 期刊论文
Natural Hazards, 2020, 卷号: 103, 期号: 3
作者:  Petković D.;  Ab Hamid S.H.;  Ćojbašić Ž.;  Pavlović N.T.
收藏  |  浏览/下载:23/0  |  提交时间:2021/09/01